Stewart Stevenson (Banffshire and Buchan Coast) (SNP): To what extent does the cabinet secretary hold Angel Trains and its contract with Wabtec accountable for the utterly and desperately bad delivery of the HSTs, with two delivered in December when 17 were contracted to be refurbished by that date?
The Cabinet Secretary for Transport, Infrastructure and Connectivity (Michael Matheson): As I mentioned, there is absolutely no doubt that the late delivery of the HSTs has had a significant impact on ScotRail’s ability to move some of its other rolling stock—the 170s in particular—to the east of Scotland, which is having an adverse impact on passenger experience in that area.
I have discussed the matter with the chair and chief executive of Angel Trains and with the global president of Wabtec in the United States, and I said that the delay is unacceptable. They provided me with assurances that they are doing everything that they can to try to move the issue forward. Some of the work is being transferred to Kilmarnock to try to speed up the refurbishment that is due to be undertaken on the high-speed trains.
There is no doubt that the delay with the HSTs is having an impact, as is the late delivery of the Hitachi 385s. I raised that issue when I discussed the matter with the global head of Hitachi in Japan and made it clear that it is unacceptable that we are experiencing on-going delays in the delivery of that brand-new rolling stock.
All those issues are having an impact on passengers’ experience of what is a significant level of investment in our railways in Scotland. I want the benefits of that additional investment to be realised sooner rather than later, and those companies all have a part to play in ensuring that they deliver the trains as quickly as possible so that passengers get those benefits.